Deposit for Construction Drawings - Stage 04 - Job 19_01

daniel-mccullough-348488-unsplash.jpg
daniel-mccullough-348488-unsplash.jpg

Deposit for Construction Drawings - Stage 04 - Job 19_01

1,350.00

Deposit at 50% of the fee as Outlined in Fee Schedule 19_01 R0, as issued on Jan 18th 2019.

Add To Cart